Project management for an architecture studio

The drawing goes to the client by email, comments come back on WhatsApp, and the version sent to the contractor is not always the one that was approved. Permitting and construction drawings share the same folder.

Who it is for

For a studio with several open projects and more than one person on the same set of drawings. A poor fit for a solo architect on one project with no approval step.

Problems this page addresses

  • Comments with no version

    The client marked up an old file. The studio corrected a newer one. Nobody can tell which comments are already closed.

  • Permitting and construction drawings share a status

    The permit is still in process, and someone already sent a drawing out to build. There is no stage that blocks that send until there is an approval.

  • The client does not know what they are paying for now

    Concept is done, permitting has started, and the invoice goes out without the client seeing the handoff.

What you get

  • Stages on the project

    Concept, permit, construction drawings, site review. A stage opens only when the previous one is closed, or marked as parallel on purpose.

  • Version and comments

    A file goes out with a version number. Comments return to that version. A new version opens only after comments are handled or declined.

  • Approval before it goes to site

    Sending to the contractor requires a mark that the client approved the version. Without it, the file stays an internal draft.

Common questions

Does this replace the drawing software?

No. Drawing stays in the studio’s software. This system tracks the stage, the version, and whether the client approved. It is not a drafting tool.

How do you roll this out without stopping open projects?

One new project goes first, with one stage. Projects already underway join only at their next stage, not by rebuilding the whole history.

Does the contractor see the same system?

Not necessarily. The contractor receives the version approved for construction. Site extras and the crew live on the renovation page, not inside the drawing folder.